Given the nature of the I-35W bridges' state upon collapse there were certain procedures that should have been followed and weren't in order to prevent such a disaster. These include, but aren't limited to, proper initial construction, more thorough inspections, and a legislative body that puts the safety of the city and its people ahead of its own agenda and personal gain.
Following the collapse of the I-35W bridge, cities nationwide sprung into action, looking closely at their bridges and bumping up the priority levels of many bridges to ensure that there wouldn't be a repeat. Some bridges were considered for closure, while others entered the queue for replacement.
The new bridge will ensure that the contractors design and build it to the proper specifications. It will have a more solid load bearing design as well as stronger materials. It will also feature new technologies that are geared toward a geographic location prone to extreme temperature swings and magnitudes. This will reduce the need for "additions" or "modifications" to the new bridge.
October 30th, the temporary bridge connecting crosstown to HWY 62 Eastbound over I-35W Northbound was deflecting due to the added weight of the asphalt being installed, so MNDOT rerouted traffic, preventing travellers from passing under the bridge. This was to prevent the possible tragedy of the bridge collapsing in the middle of rush hour.
Learned experiences from past failures
Building Codes
Structural Materials
Structural Designs
State Regulations
Federal Regulations
Sensory Devices
Traffic Cams
Construction Alternatives